Mts TestLine Manual do Utilizador Página 91

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 132
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 90
For this example, P gain was increased in increments of 1 until the drift around zero was corrected with
a P gain of 4. I gain was then set to 25% of the P gain or 1.
5. Using the Scope, verify that the corrective action was effective.
MTS TestLine Test System Operation | 91
Running the Example HCF Test
Vista de página 90
1 2 ... 86 87 88 89 90 91 92 93 94 95 96 ... 131 132

Comentários a estes Manuais

Sem comentários