Mts TestLine Manual do Utilizador Página 121

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 132
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 120
When to Do ItWhat to Do
After the valve balancing procedure (electrical
compensation) has been completed and the results
are judged unsatisfactory.
Perform Model 252 Servovalve maintenance: adjust
mechanical null.
Calibration intervals depend on system requirements
and are typically performed during scheduled
Perform sensor calibration.
maintenance by MTS trained personnel. Sensors can
include an LVDT, load cell, and extensometer.
Daily Inspections
Before the start of each day’s testing, do a quick inspection of the MTS TestLine system. Following are
typical things that should be checked daily:
Check the drip pan and ensure that there are no leaks from the actuator, hydraulic service manifold,
servovalve, or accumulators.
Ensure that electrical connections are tight, with no frayed or poorly routed cables.
Ensure that hoses are routed properly, they are not wearing, and the fittings are not leaking.
Hoses must be routed as to avoid direct heat sources, moving, or abrasive equipment.
Check actuator speed control functionality.
If any problems are encountered, they should be repaired before operating the system.
MTS TestLine Test System Operation | 121
Maintenance
Vista de página 120
1 2 ... 116 117 118 119 120 121 122 123 124 125 126 ... 131 132

Comentários a estes Manuais

Sem comentários