Mts Series 793 Controller Manual do Utilizador Página 95

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 106
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 94
Steps to Run a Test
MTS Series 793 Controller Overview Perform a Practice Test
95
9. Start the test.
A. Ensure that the following are true:
Interlocks are cleared
High hydraulic pressure is applied to the station
Load tuning parameters are optimized
The test specimen is installed
Limits are set and actions are assigned
The test program is set up
The scope and meters are set up to monitor the test as desired
B. On the Station Controls panel, press the Program Run button to start
the test. When desired, press the Program Stop button to end the test.
10. Review test data.
A. Start the Project Manager application and select the current Project.
B. Click on the BTW folder to view the name of the associated data file.
C. Click on the data file to review its contents in the view pane.
Vista de página 94
1 2 ... 90 91 92 93 94 95 96 97 98 99 100 ... 105 106

Comentários a estes Manuais

Sem comentários