
Two-Column Load Frame
Two-Column Load Frame Description
DescriptionItem
Actuator and power electronics (behind hood).1
Columns on which the crosshead moves up and down.2
Actuator rod.3
Manual crosshead locks. Crosshead locks must be in a fully locked position to run a test.4
Frame-mounted control.5
T-slot base plate.6
Load cell mounted on table top (load cell can also be mounted on the actuator).7
Crosshead lift.8
Frame-mounted status light allows you to view system status at a glance. This status is
coordinated with the MP software System panel. Status is indicated by the following colors
and a blinking or solid light:
9
AC power to the frame is off.Unlit
Interlocked.Red (Solid)
MTS Acumen™ Electrodynamic Test System 27
Introduction
Comentários a estes Manuais