Mts Acumen Electrodynamic Lift and Move Guide Manual do Utilizador

Consulte online ou descarregue Manual do Utilizador para Hardware Mts Acumen Electrodynamic Lift and Move Guide. MTS Acumen Electrodynamic Lift and Move Guide User Manual Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 26
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 0
MTS Acumen™ Electrodynamic Test System
Lift and Move Guide
100-262-064 A be certain.
Vista de página 0
1 2 3 4 5 6 ... 25 26

Resumo do Conteúdo

Página 1 - Lift and Move Guide

MTS Acumen™ Electrodynamic Test SystemLift and Move Guide100-262-064 A be certain.

Página 2

Caution notices indicate the presence of a hazard with a low level of risk which, ifignored, could cause moderate or minor personal injury or equipmen

Página 3 - Contents

ResponsibilitiesTopics:•Customer Responsibilities...

Página 4

Customer ResponsibilitiesIt is the customer's responsibility to have the facility ready to install the system and move the system to itsfinal tes

Página 5 - Technical Support

• Install accessories (fixtures, load cell, grips, and so forth.).• Plug in electrical power.• Install a controller and application software.• Run a d

Página 7 - If You Contact MTS by Phone

Packaging Dimensions and WeightsTopics:•Packaging Dimensions and Weight...

Página 8

Packaging Dimensions and WeightThe following table provides the dimensions of various load frame types when packaged for shipping. If youtransfer the

Página 9 - Documentation Conventions

Load Frame DimensionsTopics:•Load Frame Dimensions and Weight...

Página 10

Load Frame Dimensions and WeightThe following table provides the dimensions of various load frame types. If you transfer the load frame to itsfinal si

Página 11 - Responsibilities

Load Frame SpecificationsMTS Acumen 3MTS Acumen 1DescriptionDimension26 mm (1.02 in)26 mm (1.02 in)Minimum test space height1A819 mm (32.24 in)603 mm

Página 12 - MTS Responsibilities

© 2013 MTS Systems Corporation. All rights reserved.Trademark InformationMTS is a registered trademark and MTS Acumen is a trademark of MTS Systems Co

Página 14

Moving the FrameTopics:•Before You Begin...

Página 15

Before You BeginBefore moving the load frame, ensure that:• You have suitably trained lifting and moving personnel, qualified to move heavy equipment

Página 16

5. Remove the fixed wood blocks around the machine.6. Use the packing list to inventory all the boxes. Accessories can be in the container with the lo

Página 18

100-262-064 A

Página 20

ContentsTechnical Support 5How to Get Technical Support...

Página 22 - Equipment

Technical SupportHow to Get Technical SupportStart with your manualsThe manuals supplied by MTS provide most of the information you need to use and ma

Página 23

When you have more than one MTS system, the system job number identifies your system. You can findyour job number in your order paperwork.Example syst

Página 24

If You Contact MTS by PhoneA Call Center agent registers your call before connecting you with a technical support specialist. The agentasks you for yo

Página 25 - 100-262-064 A

After you callMTS logs and tracks all calls to ensure that you receive assistance for your problem or request. If you havequestions about the status o

Página 26

PrefaceBefore You BeginSafety first!Before you use your MTS product or system, read and understand the safety information provided with yoursystem. Im

Comentários a estes Manuais

Sem comentários